RE: New Green House Progress
OK here we go. backwards I guess haha.
A lot of work. But being a Superintendent in the construction industry this stuff is easy tinkering for me. Just did the cost anylasis on the organizations taxs this year. Out of pocket I spent 7634.82 on this building. However I got all the windows left over from a jobsite, the doors, about 60% of the wood framing material, and all siding. So in reality this project if funded without my hook up in the industry would be around 15,000 plus.
OK here we go. backwards I guess haha.
A lot of work. But being a Superintendent in the construction industry this stuff is easy tinkering for me. Just did the cost anylasis on the organizations taxs this year. Out of pocket I spent 7634.82 on this building. However I got all the windows left over from a jobsite, the doors, about 60% of the wood framing material, and all siding. So in reality this project if funded without my hook up in the industry would be around 15,000 plus.